[rev_slider_vc alias=”fv26″]

Choluteca I y II

Choluteca, Honduras
Services: Basic Engineering / Detail Engineering

Basic and Detail Engineering for Choluteca I and II Photovoltaic Plants with a power of 20 and 30 MW respectively located in Choluteca, Honduras.

  • Client: SUNEDISON SPAIN CONSTRUCTION, S.L.U.
  • Total Power: 50 MW
  • Project date: 2014
Menu